DSpace Repository

ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN INSTALASI PEMBUANGAN AIR LIMBAH KOTA MAKASSAR DENGAN METODE SLURRY DAN METODE AUGER BORTECH

Show simple item record

dc.contributor.author AZIS, INCE MUTHIA PUTRI
dc.date.accessioned 2023-03-10T07:18:33Z
dc.date.available 2023-03-10T07:18:33Z
dc.date.issued 2021
dc.identifier.other 45 16 041 153
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/5190
dc.publisher UNIVERSITAS BOSOWA en_US
dc.title ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN INSTALASI PEMBUANGAN AIR LIMBAH KOTA MAKASSAR DENGAN METODE SLURRY DAN METODE AUGER BORTECH en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account